Statewide ConstructionNC LICENSED GENERAL CONTRACTOR #67004 · RALEIGH, NC

How We Work

Know what you are agreeing to.

A clear proposal names the work, the materials, and the details that matter—without asking you to guess what “repair as needed” includes.

What is a true line-item construction scope?

A true line-item construction scope names each assembly, its measured quantities, specified materials, installation method, and boundaries of work. Statewide documents fastening, flashing, protection, and inspection requirements so homeowners can compare what is included. Photo review establishes an initial scope; on-site measurements and concealed conditions may require confirmation before final pricing.

The detail behind each line

We measure the assembly, specify the materials and fasteners, and plan the sequence before proposing the work. Protection, removal, preparation, installation, and cleanup are named rather than buried. Our internal calculations stay internal; your proposal explains what will be built and the agreed pricing.

What a vague total leaves unanswered

Organized around the actual assemblies

Where useful, scopes follow CSI divisions: Division 06 for wood framing and carpentry, Division 07 for thermal and moisture protection, and Divisions 22, 23, and 26 for plumbing, mechanical, and electrical work. The purpose is simple: make responsibilities and the connections between trades clear.

Photos first, final checks in person

Photos help identify likely work and useful questions. They cannot reveal every concealed condition or replace physical measurements, structural design, or required inspections. Clay Curtis confirms those details on site and discusses any scope changes before the affected work proceeds.

Sample Proposal Viewer

Same leak. Two proposals.

PROPOSAL — ILLUSTRATIVE VAGUE QUOTE

Repair leak at back of house, replace siding as needed, roof work.

$8,500.00

* Additional rot billed at time & materials. Price valid 7 days.

STATEWIDE CONSTRUCTION LLC — ILLUSTRATIVE SCOPE

AssemblySpecification
Remove failed step flashing14 pcs — each termination documented before demo, substrate moisture-checked
Replace rotted rafter tails3 ea — 2x8 Southern Yellow Pine, scarf-cut and sistered to the load path
Replace roof decking2 sheets 7/16" OSB — staggered seams, ring-shank fastened to framing
Install kick-out flashing2 ea at roof-to-wall terminations — formed on site, lapped into WRB
Re-lap WRB at roof-to-wall24 LF — lapped into window flanges and taped per manufacturer spec
James Hardie lap siding64 SF — scribed and cut in place for tight reveals, stainless fasteners
CertainTeed Landmark Pro tie-in1.5 SQ — underlayment, courses, and valley detail coordinated to the applicable manufacturer specification
Required permits and inspectionsApplicable jurisdiction and permit requirements confirmed before regulated work begins

Illustrative sample, not an actual project or price. Measured quantities and assembly details clarify what is included. Site verification and concealed findings may require an agreed scope change.

Answers

Questions homeowners ask before hiring

Clear photos can support an initial renovation or structural repair scope. A seasoned NC Licensed General Contractor #67004 reviews visible framing, foundation lines, water stains, and material transitions. Photos cannot confirm concealed damage or exact dimensions; on-site measurements, moisture checks, engineering where required, and local permitting inform the final agreed scope and pricing.

Start with Your Photos

Send 2–4 photos. Understand the proposed work before scheduling a visit.

Submit Details for Review