Custom kitchens with cabinet-grade precision
Removing a wall or adding a large island can change loads and utility routes. We coordinate specified LVL beams, bearings, and supports, with engineering where required, before installing cabinetry. Our 1/32-inch fine-carpentry approach guides appropriate fitting and reveals; beam deflection, subfloor requirements, and countertop manufacturer specifications govern the supporting assembly.
Waterproof bathrooms & en-suites under GC oversight
Tile longevity starts behind the wall. Clay checks framing, subfloor deflection, and substrate flatness before coordinating the waterproofing membrane, drain connections, and wet-area transitions. Curbless showers require planned elevations, drainage, and a compatible waterproofing assembly—not simply a thinner threshold. Required testing and inspections happen before finishes conceal the work.
Whole-house renovations for North Carolina homes
Piedmont clay can shrink and swell as soil moisture changes. Before a whole-house renovation becomes drywall and paint, we evaluate visible joist deflection, plumbing slopes, crawlspace supports, and moisture conditions. The scope connects those findings to the rooms above, with structural engineering and local inspections where required.
Plan the utilities before cutting the framing
Drain lines want slope, ducts want volume, and joists want to stay whole. We lay out MEP routes before the first cut, using engineered joist openings, dropped soffits, or reframed chases — with penetrations and notches checked against the structural design and applicable requirements.
The cabinet-grade difference
- Wall planes checked and prepared for level cabinet runs and consistent reveals.
- Subfloor flatness and structural deflection checked separately against the tile assembly requirements before membranes go down.
- Openings checked for square so casings and built-ins meet with intentional, consistent gaps.
